How it works
Fitted once. Ready whenever you stop.
The Profile Rail System goes on your van once. After that, the sail goes up and comes down in a few steps, on your own.

Once
How the rail system mounts
Step by step
Once · The Profile Rail System on the roof
- Join the three 3030 profiles into one rail system.
- Fit the rail system on the van's fixing points.
- Tighten the six bolts.
Every time · The sail through the rail system
- Pull the sail into the rail system.
- Assemble the two support poles.
- Put the support poles in the sail.
- Set the six ground anchors in the ground.
- Attach the six storm straps.
Every trip
Four steps to shade.
-
01
Sail into the rail
Stand on an ordinary, stable step stool, feed the first 10 to 15 cm of the sail's edge into the rail, and pull the rest through from the ground with the pulley strap.
-
02
Poles up
Two support poles hold the outer corners. Set the height and lock it.
-
03
Anchors in
Six storm straps go from the sail to six ground anchors in soft ground.
-
04
Shade
14.5 m² of shade.
Packing down is the same steps in reverse. Everything goes back in the bag, only the rail stays on the van. In steady rain, take it down.
The system
Every part, up close.

01 / 06 · Rail
3,435 mm
Profile Rail System in 3 sections, 3,435 mm in total, 30 × 30 mm profile.
Fitted once in about 5 minutes. The sail slides into a 10 mm channel.

02 / 06 · Sail
14.5 m²
5.6 × 3 m. Marine-grade dyed acrylic fabric, PU-coated, UPF 50+.
Water-repellent. In steady rain, take it down.

03 / 06 · Poles
2,000 mm
2 support poles, each made of two 1,000 mm tubes, 20 × 20 mm aluminium.
With a height lock, so the sail stays where you set it.

04 / 06 · Anchors
400 mm
6 ground anchors, 400 × 80 mm, Ø8.
For soft ground like a lawn. On gravel or asphalt, use anchors made for it.

05 / 06 · Straps
6 × 2.5 m
6 storm straps with carabiners.
I have had it up in winds of more than 15 m/s.

06 / 06 · Bag
123 cm
123 × 20 × 20 cm. Sail, poles, anchors and straps in one bag.
11 kg in the bag, 4 kg on the van.
Jakob explains
Watch these before you buy.
From order to first shade
How it goes.
-
Today
You order
A deposit now and the rest when it ships, or the full amount at once.
-
Until March
The first series is made
We write to you when there is news from production, and always before we ship.
-
March 2027
It ships
From our warehouse in Denmark. Delivery and duties are paid.
-
Day one
The rail goes on
About 5 minutes, once, with the manual for your van.
-
Every trip
Shade
Sail into the rail, poles up, anchors in.
Choose your setup.
The complete system, just the rail or just the sail. Free delivery, duties paid. Ships March 2027.
See prices and setups